One stage in a 100 m² rooftop installation
The rooftop team assembled helmets, protective wear, tools and the printed face before the 100 m² installation began.
This clip belongs to the documented sequence covering preparation, rooftop unfolding, upper-edge alignment, lower tightening and the completed street view.
